The stabilization of base materials, application of the asphalt concrete surface, and shoulder dress up was performed.
The stabilization of base materials, application of the asphalt concrete surface, and shoulder dress up was performed.
Standard Harris County Stormwater Pollution Plan specifi cations and details were utilized to manage construction activities.
This project was fi nanced with GLO disaster relief funding. Joshua Netardus, P.E. served as Project Manager.